skip to navigation

Case Studies

Content here

Case Studies

Reading the profiles of some of our previous projects is an excellent way of finding out how Arcos Consultancy could assist you in similar projects. Choose a case study to download a PDF for full details.

Marner Primary School case study

Marner Primary School is Tower Hamlets' largest and most ambitious primary school expansion project to date. The works were divided into a number of phases. The existing school building is of a traditional brick construction of the Victorian period, featuring stone plaques and detailed facades, and the proposal aimed to preserve and showcase the West facades.

Read more - download this case study

Morpeth Performing Drama and Arts case study

Morpeth Secondary School is made up of a mix of buildings, including a Victorian maths block, an award winning three storey academy block, contemporary dining and library facility as well as the new building for drama, performing arts, music and PE, which officially opened in October 2007.

Read more - download this case study

Arnhem Wharf School case study

The Arnhem Wharf School project consisted of 2 phases - a 667 sq metre double storey extension to the North and a combination of a 1066 msq new-build double storey learning wing completed to match the shape and style of the existing building and a new large open plan atrium.

Read more - download this case study

Smithy Primary School case study

Including a new build extension comprising two floors of modern design appearance, this project specifically caters for a new nursery on the ground floor and additional extended school use and multi flexible community accommodation on the upper floor. The project also includes internal alterations and refurbishment works.

Read more - download this case study

Bygrove School case study

The extension to Bygrove Primary School consisted of a single storey extension to the front of the school with some refurbishment works to the existing classrooms. The works also incorporate some new hard and soft landscaping around the immediate areas of the works.

Read more - download this case study